Campus Power Shut Down, Round 2

Bayley will be shutting down power to the following buildings as part of the ongoing work for the Bracken building.  The following buildings will be shut down on Saturday, 11/1, starting at 2:30pm through Sunday, 11/2, until 7pm:

  • 1800
  • 1900
  • 2000
  • 2100
  • 2300

No electrical or heat will be available during these dates/times.  Please reach out to the office of Facilities & Capital Projects if you have any questions.

Leave a comment