Upcoming project: Boiler replacement for buildings 2000, 5000, and 9000

Project Update, 4/28/2025: There has been a change in the schedule for our boiler project. 

The contractor, ATS, will be bumping building 2000 to the top of the list, with 5000 and 9000 shifting down.  They will begin in building 2000 from 4/29 to 5/17, then 5000 from 5/5 to 5/28, and then building 9000 from 5/8 to 5/30.  We apologize for this last-minute change.


As previously mentioned, there will be intermittent noise and a minor odor when they are welding.  Please contact facilities if you have any questions or feel you will need a heater.We are about ready to start our Boiler replacement project.   This project will run from April 29th to June 30th, 2025.

The contractor, ATS, will be replacing the boilers in buildings 2000, 5000, and 9000.  They will begin with Building 5000 from 4/29 to 5/17, then building 9000 from 5/5 to 5/28, and then building 2000 from 5/8 to 5/30.

During these times, the heat will be shut down in each building, however there will still be air flow and AC (for those buildings that have AC).  As we enter our warmer season, we are hopeful that the lack of heat will have little to no impact on the building occupants.  If individuals in those buildings need heat, please contact facilities and we’ll bring you a portable heater to use while the boilers are being replaced.

Please keep in mind that this work will have intermittent noise and minor odor from the welding.  The contractor will do their best to minimize any impact to the college and conduct much of the noisy work from 6-8am.

Feel free to reach out to Kimberlee Clarke if you have any questions.

Elevator Service Outage – Bldg. 2000, 4000, 6000

Dear Campus Community,

As of this morning, the elevators in buildings 2000, 4000, and 6000 have been taken out of service due to a systems failure found during annual inspections. We do not yet have a timeline for when any of the elevators will return to service, but updates will be given as they become available. 

Signage has been posted at each elevator entrance notifying individuals that the elevator is out of service. Additional signage will be provided at each elevator entrance for the general public and/or students, regarding who to contact in the building if they need to contact a department located on an upper floor and are unable to utilize the stairs. 

For those who may require accommodations as a result of the elevators being out of service, please contact Human Resources at scchr@shoreline.edu

For all other questions, please feel free to email Acting Director of Safety & Security Greg Cranson at gcranson@shoreline.edu

Respectfully,

Your Department of Safety & Security

PUB (9000 Building) Furniture Update

Dear Campus Community,

I am writing to inform you that the lounge furniture on the main floor of the PUB will be removed for reupholstering and repair starting Monday May 27, 2024. This exciting update is part of our ongoing efforts to enhance the comfort and aesthetic of our shared spaces.  We expect the furniture to be returned right before commencement, looking better than ever!  We apologize for any inconvenience this may cause, but will be putting a couple of temporary tables and chairs there in the interim.

Thank you for your understanding and patience during this period. We are confident that the updated furniture will greatly enhance the student experience.

If you have any questions or concerns, please do not hesitate to reach out.

Best regards,

Kim Clark

Director of Facilities and Capital Projects