Construction Update 1/8-5/8/24

Hello Campus Community,

Forma will be conducting some concrete work around 2900 and 4000 starting Monday, 1/8/24 through 5/9/24.  A few paths near both 2900 and 4000 will be closed and repaved.  The map below shows which areas will be closed.  Signage will be placed to redirect foot traffic around the closed areas.  Feel free to contact me if you have any questions.

Thanks

Kimberlee Clark

Director of Facilities and Capital Projects

Shoreline Community College

This is a map of campus showing where the construction will be.

Facilities Update: Stairwell Work in 2900 Building this Week

Hello Campus Community,

Facilities will have a contractor onsite next week to pressure wash and recoat the north and south stairwells at the 2900 building.  They will have signage posted around the stairwells and keep one open at all times during work.  The schedule is as follows.

11/28 – pressure wash one stairwell at a time. 

11/30 – prep and paint one stairwell.

12/1 – prep and paint one stairwell.

Feel free to email Kim Clark (kclark@shoreline.edu) if you have any questions.

Thanks

Facilities

Update from Facilities re: Building Heat

Good morning,

Due to the ransomware incident, Maintenance lost the ability to monitor the heat in buildings through our access control system.  We have been working diligently with TSS and our control system provider (ATS) to resolve this issue.  Until we have access to our system, Maintenance has been adjusting the heat manually at each building throughout the day.  Though we can manually adjust, we are unable to set a temperature range and we are unable to monitor when buildings become too hot or cold.  If your area is chilly, please email Facilities (facilities@shoreline.edu).  We will do our best to respond quickly to adjust the temperature.  

Thank you for your patience and understanding.

Facilities

Construction Update-Planned Power Outage in Several Buildings on Campus Coming up Soon

Hello Campus Community,

For our new 6000 building, the contractor, Forma, will be conducting a few building power shutdowns on campus.  Here is the schedule and which buildings will be impacted.  

Friday, 10/27:  Buildings 2700 and 2800 (preparation for decommissioning).

Saturday, 11/4, and Sunday, 11/5:  Buildings 1800, 2100, 2200, 2300, 2900, 3000, and 5000. Power will be off in these buildings from 7am on 11/4 until 4pm on 11/5.

Feel free to reach out if you have any questions.  We appreciate your patience while we finish up this project. 

Thanks

Kim

Sidewalk Work Happening Around Campus Friday 10/27

Good afternoon,

This is a campus notice for work that will be started and completed on Friday October 27th. The work includes lifting sidewalks where possible and grinding where necessary to improve safety across campus walkways. The areas that this company, SlabJack NW, will be working are:

  • 2000 building VCT-Main Entrance
  • 1900 building PCC- front, sidewalk near drop-off circle
  • 4000 building Library – Slope north of library east/west walkway
  • 3000 building Gymnasium- main entrance
  • 4000 building Library – walkways in front of lower level entrances
  • 1100 building-North walkway slope east/west
  • 1400 Building – South entrance and walkways
  • 1400 building- north entrance and walkways
  • Entrance from West parking to walkways between 1300 and 1400

If you have any questions, please reach out to Kim Clark kclark@sbakershoreline