Ongoing construction of the Health Sciences and Advanced Manufacturing Classroom Center (HSAMCC) will require the contractor to briefly shut down the water supply to buildings 2700, 2800, and 2400 (boiler) on Friday, June 3 from 6:00 – 7:00 a.m.
Ongoing construction of the Health Sciences and Advanced Manufacturing Classroom Center (HSAMCC) will require the contractor to briefly shut down the water supply to buildings 2700, 2800, and 2400 (boiler) on Friday, June 3 from 6:00 – 7:00 a.m.
Leave a Reply