Upcoming project: Greenhouse/Pond

We are ready to start our Greenhouse/pond project on the south side of the Cedar building. This project will run from May 27th to December 30th, 2025.  Our contractor, Forma, will begin with the installation of the construction fence on May 27th and 28th.  

The attached site logistic plan outlines the construction zone, access points for construction vehicles, delivery access for materials, and their construction laydown area.  The pathways leading to Cedar will be accessible while both Bracken and the Greenhouse/pond are under construction.

Please contact Kimberlee Clark if you have any questions.

Upcoming project: Boiler replacement for buildings 2000, 5000, and 9000

Project Update, 4/28/2025: There has been a change in the schedule for our boiler project. 

The contractor, ATS, will be bumping building 2000 to the top of the list, with 5000 and 9000 shifting down.  They will begin in building 2000 from 4/29 to 5/17, then 5000 from 5/5 to 5/28, and then building 9000 from 5/8 to 5/30.  We apologize for this last-minute change.


As previously mentioned, there will be intermittent noise and a minor odor when they are welding.  Please contact facilities if you have any questions or feel you will need a heater.We are about ready to start our Boiler replacement project.   This project will run from April 29th to June 30th, 2025.

The contractor, ATS, will be replacing the boilers in buildings 2000, 5000, and 9000.  They will begin with Building 5000 from 4/29 to 5/17, then building 9000 from 5/5 to 5/28, and then building 2000 from 5/8 to 5/30.

During these times, the heat will be shut down in each building, however there will still be air flow and AC (for those buildings that have AC).  As we enter our warmer season, we are hopeful that the lack of heat will have little to no impact on the building occupants.  If individuals in those buildings need heat, please contact facilities and we’ll bring you a portable heater to use while the boilers are being replaced.

Please keep in mind that this work will have intermittent noise and minor odor from the welding.  The contractor will do their best to minimize any impact to the college and conduct much of the noisy work from 6-8am.

Feel free to reach out to Kimberlee Clarke if you have any questions.

Last Chance to Vote! College Name-Change Survey Closes Soon.

Just a reminder: we’re seeking your feedback about changing the name of our college from Shoreline Community College to Shoreline College, and the deadline to vote is near.

We’ve put together a brief survey that outlines some of the key reasons people support or oppose the change and asks for your vote.

 This survey closes at 8:00 a.m. tomorrow, Thursday, April 24, 2025.

Click here to view the survey and cast your vote. 

If you haven’t already done so, we hope you’ll take a few minutes to review the survey and share your thoughts.

UPDATE: Bldg 5000/FOSS & Women’s Locker Room Re-Opening Wednesday 4/23/25

We’re happy to report the plumbing issue impacting Bldg 5000/FOSS and Bldg 3000/Gym Women’s Locker Room has been resolved! The custodial team will be sanitizing floors, etc. tonight to ensure the building is ready for use again tomorrow. 

Effective tomorrow (Wednesday), April 23, 2025, both Bldg 5000/FOSS and Bldg 3000/Gym Women’s Locker Room will resume normal operations. Supervisors should ensure closures signage and messaging is removed, and that all employees are updated regarding the return to on-campus work and activities within Bldg 5000/FOSS.

Questions regarding the information above can be directed to hr@shoreline.edu at any time.

Bldg 5000/FOSS & Gym Women’s Locker Room CLOSED:

Further analysis of the plumbing issue in Bldg 5000/FOSS has identified additional impact from the use of the Women’s Locker Room in Bldg 3000/Gym. While the College continues to work on a fix for the plumbing issue, please see the following directions:

  • Bldg 5000/FOSS remains through closed TODAY, Tuesday April 22, 2025
    • Employees should continue to work online from home or connect with HR if an alternate on-campus location is needed.
    • Service units should update signage/messaging to reflect today’s closure.
    • In-person appointments scheduled for today should be switched to online.
    • NOTE: Supervisors should update part-time/temporary/student staff who may not regularly check for email updates.
  • Women’s Locker Room in Bldg 3000/Gym is closed TODAY, Tuesday April 22, 2025
    • While no impact is anticipated to PE classes at this time, employees utilizing the fitness room should note the women’s showers/bathrooms are not available for use.

Please plan for another update to be made to campus no later than 4:30pm today (Tuesday, April 22, 2025).