The Seattle International Film Festival (SIFF) is here!

Here’s the schedule for SIFF screenings at Shoreline for this weekend!

Friday, May 12The Eight Mountains7:00 PM
 Saturday, May 13Ernest & Célestine: A Trip to Gibberitia1:30 PM
Saturday, May 13A Letter From Helga4:00 PM
Saturday, May 13Other People’s Children7:00 PM
 Sunday, May 14Stephen Curry: Underrated1:00 PM
Sunday, May 14Lonely Castle in the Mirror4:00 PM
Sunday, May 14Pianoforte7:00 PM

For tickets visit: https://www.shoreline.edu/foundation/events/siff-opening-night.aspx or click on the individual films linked in this message.

As a reminder, all concession sales during SIFF at Shoreline Community College benefit the Shoreline Community College Foundation’s Performing Arts and Digital Filmmaking Scholarship fund, and other Foundation scholarships and programs. So be sure to enjoy some popcorn!

A graphic design of an astronaut flying through space surrounded by images from movies.

Timesheets are Due!


All Employees
:

   Absences:

  • Absences for the pay period 5/1-5/15 must be completed by end of shift Friday, May 12th, 2023
  • Supervisors must approve absences by 8am on Monday, May 15th, 2023
    • When submitting the following leave types please send an email to payroll@shoreline.edu
      • Shared Leave
      • Leave without Pay

Classified and Hourly/Student Employees: 

   Timesheets:

  • Timesheets must be completed by end of shift, Monday 5/15/2023. 
  • Supervisor must approve timesheets no later than 10am, 5/17/2023.

Hourly/Student: Please submit your timesheet by end of shift Monday 5/15/2023.

  • Please be sure to use the correct Time Reporting Code for your position
    • HRY for non-student hourly employees
    • STU for student hourly employees enrolled in 6 or more credits
    • STF for student hourly employees enrolled in less than 6 credits
    • FWS for federal work-study students
    • SWS for state work-study students
      • Do not see the correct Time Reporting Code?  Please email payroll@shoreline.edu

Classified: Please submit your timesheet  by end of shift Monday 5/15/2023.

  • Did you take leave during this last pay period?  Be sure to adjust your REG hours on your timesheet to reflect what hours you worked and were on leave.
  • Make sure each week equals your work schedule; 100% employee, then you should have a minimum of 40 hours posted between REG and any leave, 75% employee, then you should have a minimum of 30 hours posted between REG and any leave.  This includes any Leave without Pay posted.
  • Overtime to be charged to a budget other than the employees normal budget, please email the combo code (not the chart string) to payroll@shoreline.edu.
  • Did you work overtime and take leave in the same week?  Please email payroll@shoreline.edu until further notice. 

Faculty: Please be sure to submit your sick leave through the absence management system, by the date listed above. You do not need to submit a timesheet.

Admin Exempt: Please be sure to submit your leave through the absence management system, by the date listed above. You do not need to submit a timesheet.

Construction Update for 3000 Building and 2900 Parking Lot

Hello Campus Community,

We have a minor improvement project starting this week.  This is an accessibility project for the 3000 building and 2900 parking lot.  For this project, the contractor will be installing a ramp on the north side of the 3000 building to allow for accessibility access to the 1st floor of the 3000 building.  The contractor will also be adjusting the slope for 2 accessibility parking stalls on the south side of the 2900 building parking lot.  This project has been divided into two phases.  The first phase will be the ramp which will generate noise on campus while they break up concrete.  The NE stairwell for 3000 will have intermittent accessibility as they break up the concrete and replace.  There will be access on the NW side of 3000 and access to the motorcycle parking on the north side of 3000.  The second phase will include repaving the 2 accessibility stalls on south side of 2900.  The purpose is to adjust the slope of the parking stalls and to provide a correctly sloped path from the parking stalls to the new ramp.  There will be intermittent impacts to the 2900 parking lot.  More communication will be sent once I receive the schedule and impacts to the 3000 and 2900.  

Feel free to contact me if you have any questions.  

Thank you,

Kim Clark  

This is a diagram of the project location and area of impact described in the e-mail.

Today (5/11)- Fire Alarm Strobe and Horn Test, Bldg. 1600

Campus Community,

Last night, the college was made aware of a mandatory compliance test that is going to take place today, May 11th in Building 1600. Today from 2:00PM-3:30PM, the Bldg. 1600 fire alarm will be activated for short periods as the Fire Marshal’s Office conducts a final review of our new Bldg. 1600 fire system. Unfortunately, the timing of this test cannot be changed. I apologize for the distraction that this will cause the programs surrounding Bldg. 1600. If you have any questions, please feel free to contact me at gcranson@shoreline.edu

Respectfully,

Gregory Cranson

Director of Safety & Security

The Food Trucks are Coming!

Good morning!

Today I have a little teaser to whet your appetite and give you something to look forward to later this year.

We are excited to announce that we have entered a partnership with Seattle Food Truck to offer hot meal options on campus this fall!  

This is the logo for Seattle Food Truck.

Beginning Tuesday September 12, 2023, there will be food trucks on campus every Tuesday and Thursday throughout the fall quarter until 12/21/23.  We also hope to continue this into the spring as well.

Jonathan Amato has been the location manager for Seattle Food Truck for several years and knows the Shoreline College community well. He will be pulling data from past services offered to determine the most popular and highest volume of meals purchased based on type of cuisine, and will ensure there are variety of offerings throughout the 14.5 weeks of service in Fall Quarter 2023. 

So, get your pants with the stretchy waistbands ready, and prepare for a delicious fall. 🙂

Enjoy the sunshine today!

Cat

Cat Chiappa, MAT

Executive Director of Strategic Communications and Marketing