STEAM – Campus Power Shut Down 11/9

Bayley will be shutting down power to the following buildings on Sunday, 11/9 as part of the ongoing work for the Bracken building:

  • 1800
  • 1900
  • 2000
  • 2100
  • 2300

No electrical or heat will be available on this date from 7am to 7pm. 

Please reach out to the office of Facilities & Capital Projects if you have any questions.

(UPDATE) Innis Arden – Sidewalk Project

Dear Campus Community,

Please see below for updates regarding the Innis Arden Sidewalk Project.

CAMPUS GATES

  • The Main Gate and Exit Only have reopened, and all gates have returned to normal operations.
    • The East Gate and West Gate will resume their nightly closures, making the Main Gate the only campus entrance from approximately 11:00PM – 6:00AM.
  • Traffic bollards/cones are being used as temporary guidance for the exit lane of the Main Gate (photos below)

KING COUNTY METRO

  • King County Metro will remain on their reroute, not entering campus, until further notice.
    • Access the King County Metro route revisions by clicking the following link KCM Schedules and maps
      • Search for your Route # and all service advisories affecting that route will be noted near the top of the page.

ADDITIONAL INFORMATION

  • The project is on pause for an unknown period due to external factors outside the control of the college. The new sidewalk sections already in place will remain closed until full project completion.
  • The recently placed signs providing direction to the Visitor Lot will remain in place at least through the end of the month to aid new students.

Questions can be directed to Director of Facilities Kim Clark, kclark@shoreline.edu  or Safety & Security, safetyandsecurity@shoreline.edu at any time.

8/11 UPDATE: Innis Arden Sidewalk Project

This is an update regarding campus road closures and King County Metro closures that will occur due to work along NW Innis Arden Way:

  • Main Gate Closure:
    • Closed: Tuesday, 7/22-Friday, 8/15
      • During this closure, the East Gate and West Gate will be open to enter campus.
      • During this closure, the East Gate and West Gate will be open to exit campus. 
    • During this closure, King County Metro buses will not stop on campus. All routes that pick up on campus will be moved to stops on NW Innis Arden Way and Greenwood Ave N.
      • Access the King County Metro route revisions by clicking the following link KCM Schedules and maps
        • Search for your Route # and all service advisories affecting that route will be noted near the top of the page.
    • During this closure, a temporary ADA accessible sidewalk will be placed connecting the existing NW Innis Arden Way sidewalk and the campus sidewalk just inside the Main Gate.
  • Exit Only Closure:
    • Thursday, 8/28 – Wednesday, 9/17
      • During this closure, the East Gate, West Gate, and Main Gate will be open to enter campus.
      • During this closure, the East Gate, West Gate, and Main Gate will be open to exit campus. 
    • During this closure, King County Metro buses will not stop on campus. All routes that pick up on campus will be moved to stops on NW Innis Arden Way and Greenwood Ave N.
      • Access the King County Metro route revisions by clicking the following link KCM Schedules and maps
        • Search for your Route # and all service advisories affecting that route will be noted near the top of the page.

Questions can be directed to Director of Facilities Kim Clark, kclark@shoreline.edu  or Safety & Security, safetyandsecurity@shoreline.edu at any time.

Map of campus with temporary bus stops identified.

UPDATE: Sidewalk Construction Project

This is an update regarding campus road closures and King County Metro closures that will occur due to work along NW Innis Arden Way:

  • Main Gate Closure:
    • Tuesday, 7/22 – Tuesday, 8/5
      • During this closure, the East Gate and West Gate will be open to enter campus.
      • During this closure, the East Gate, West Gate, and Exit Only will be open to exit campus. 
    • During this closure, King County Metro buses will not stop on campus. All routes that pick up on campus will be moved to stops on NW Innis Arden Way and Greenwood Ave N.
      • Access the King County Metro route revisions by clicking the following link KCM Schedules and maps
        • Search for your Route # and all service advisories affecting that route will be noted near the top of the page.
    • During this closure, a temporary ADA accessible sidewalk will be placed connecting the existing NW Innis Arden Way sidewalk and the campus sidewalk just inside the Main Gate.
  • Exit Only Closure:
    • Thursday, 8/28 – Wednesday, 9/17
      • During this closure, the East Gate, West Gate, and Main Gate will be open to enter campus.
      • During this closure, the East Gate, Main Gate, and West Gate will be open to exit campus. 
    • During this closure, King County Metro buses will not stop on campus. All routes that pick up on campus will be moved to stops on NW Innis Arden Way and Greenwood Ave N.
      • Access the King County Metro route revisions by clicking the following link KCM Schedules and maps
        • Search for your Route # and all service advisories affecting that route will be noted near the top of the page.

Questions can be directed to Director of Facilities Kim Clark, kclark@shoreline.edu  or Safety & Security, safetyandsecurity@shoreline.edu at any time.

Map of campus with temporary bus stops labeled.

Upcoming project: Greenhouse/Pond

We are ready to start our Greenhouse/pond project on the south side of the Cedar building. This project will run from May 27th to December 30th, 2025.  Our contractor, Forma, will begin with the installation of the construction fence on May 27th and 28th.  

The attached site logistic plan outlines the construction zone, access points for construction vehicles, delivery access for materials, and their construction laydown area.  The pathways leading to Cedar will be accessible while both Bracken and the Greenhouse/pond are under construction.

Please contact Kimberlee Clark if you have any questions.