Message from Facilities Director Jason Francois: Parking Impacts on Campus (April 8-11, 2019)

Dear Colleague,

In preparation for site work related to the new Allied Health, Science & Advanced Manufacturing building, the construction team will need to take four (4) soil borings and conduct a water infiltration test.

On Monday, April 8 through Wednesday, April 10, the north (back) third of the Greenwood Parking Lot will be closed for test pit excavation and infiltration testing.  The area will be barricaded from the rest of the lot. There should not be any disruption through noise or traffic to the rest of campus during this testing.

At this time, the expectation is to have the Greenwood lot fully open for parking on Thursday, April 11.

Throughout the day on Thursday, April 11, there will be four (4) borings at the locations in the photos below. Unfortunately, this will impact several parking spots. Work at each location is anticipated to take a few hours. The work will be done in sequence, not at the same time, and the exact sequence will be determined by the geo-tech company on site.


All work related to the borings and infiltration test will be completed by close of business on Thursday, April 11.

I appreciate your patience while commence with work on this exciting new project!  Please contact me if you have any questions.

Sincerely,
Jason Francois
Director-Facilities and Capital Projects
(206) 546-4514
jfrancois@shoreline.edu

Campus Map: https://www.shoreline.edu/map/campus-map.aspx

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s