College community,

 Ongoing construction of the new HSMACC building will require another shutdown.  Gas will be shut off in the 2000, 2100, 2300, 2400 Boiler, and 2600 buildings from 8:00 a.m. on March 28 through 3:00 p.m. on March 30.  Buildings 2220 and 2700 will lose heat during this time as well.   The PUB and student housing will not be impacted.

We scheduled this work for spring break to minimize disruption and inconvenience for faculty, staff, and students.