UPDATED: Full Campus Power Shutdown Notice – Saturday, August 21

Please be advised, the College’s original power shutdown date of August 14 was rescheduled to August 21 due to scheduling changes with Seattle City Light (SCL).  

Here is the most updated information, including the impact on our computer networks: 

Full Power Shutdown of the Entire Campus 

Date & Duration:

Saturday 8-21-21, 7 AM to 3 PM, 8 hours 

Areas Affected: 
All building across the entire Shoreline Community College Campus will experience loss of power. SCL will be performing electrical work in building 9000. SCL will also be accessing the electrical vault in the East access road. 

Impact on Campus Technology Access: 
Technology Support Services (TSS) server and networking equipment operation will be maintained by backup generators. All web-based services are expected to remain online and available. 

Services that will be unavailable:  

  • Employee Remote Desktop Services will not be available to connect to employee desktops 
  • Campus Wireless Networks will not be available 
  • Student Remote Desktop Services (Splashtop) will not be able to connect to shared instructional computers 

Purpose/Scope: 

To perform required maintenance work on the electrical switch gear in building #9000. This will allow electricians to safely perform smaller localized shutdowns for the HSAMCC project and other future projects on campus. It will also help mitigate campus electrical outages or electrical gear failures in future. Eaton will be cleaning and testing the switch gear in building #9000.  

Thank you for your flexibility and understanding.

Changes in the Facilities Department

Greetings,

I am reaching out to share that Pete Babington has left his position at Shoreline. Following Pete’s departure, I am happy to announce that Bob Roehl will be stepping in to provide leadership as Acting Director of Facilities at the College. As many of you may recall, Bob has prior experience serving in this capacity at Shoreline, and we are beyond thrilled he was available to step back in to the position.

While the College moves forward with recruiting a permanent Director of Facilities position, please continue to direct your inquiries as follows:

Please also remember that requests for Facilities to complete work on campus should be submitted by placing a work order request.

Thank you,

Dawn Beck

Vice President for Business & Administrative Services

Full Campus Power Shutdown Notice – Saturday, August 14

Please note, due to HSAMCC construction on campus, the entire College will lose power on Saturday, August 14, from approximately 7 am-3 pm.

Full Power Shutdown of Entire Campus:

Date & Duration:

8-14-21, 7 AM to 3 PM, 8 hours. Alternate date in case of SCL or SCC cancelation is 8-21-21, 7 AM to 3 PM (will re-notify if this change is made)

Areas Affected:

All power to the entire Shoreline Community College Campus, SCL service shutdown. The work will be performed in the building #9000 Electrical Room adjacent to Mail Room. SCL will be accessing their electrical vault in the East access road.

Purpose/Scope:

To perform required maintenance work on the electrical switch gear in building #9000. This will allow electricians to safely perform smaller localized shutdowns for the HSAMCC project and other future projects on campus. It will also help mitigate campus electrical outages or electrical gear failures in future. Eaton will be cleaning and testing the switch gear in building #9000.

Thank you for your flexibility and understanding.

Student COVID Check-In Station Moves to Bldg 2900 as of June 28

Good afternoon everyone,

The COVID Check-In Station has been moved from the Automotive Showroom to the lower level of Building 2900 in Room 2909. This move was necessitated by the 2500 building (Manufacturing program) needing space for classes. 

The new location for the Check-In Station is next to the Curbside pick-up/drop-off area. There is signage directing students from the main gate to the 2900 building.

This location will be staffed starting Monday June 28, the first day of Summer Quarter. It will be open Monday-Thursday 6:45 a.m. – 4:00 p.m.

Thank you,

Ric (James Doike-Foreman)

Systems Administration

Technology Support Services

Planned Building Shutdowns June 26 & July 6, 10, 17

Update as of June 28: The shutdown dates below have been postponed to mid-late July. Additional information will be shared when as soon as the work is rescheduled. Thank you for your patience and flexibility.

The HSAMCC project will have planned shutdowns of select buildings that provide services to the existing 2500 building. Please be aware of these changes; dates and locations may be subject to change.

Saturday, June 26 – Telecom Demo of Bldg. 2500:

  • Description: Disconnect the fiber cable that feeds 2500. Data, telecom, security, and HVAC controls will be offline after June 26 in 2500.
  • Areas Affected: 2500, 2600, data room/racks in 5000.
  • Duration: 7 am-3:30 pm on June 26.

Tuesday, July 6 – Fire Alarm Shutdown of Bldg. 2500:

  • Description: Disconnect the fire alarm that serves 2500. Requires access to 2500, 2600 & the FACP in 9000. We do not anticipate any testing of the notification devices (no horns/strobes). Building 2500 cannot be occupied by the College/public after July 6 as it will be under construction.
  • Areas Affected: 2500, 2600, FACP in 9000.
  • Duration: 7 am-3:30 pm on July 6.

Saturday, July 10 – Power Feeder Shutdown for Bldg. 2300:

  • Description: Shutdown Feeders C and D in 9000. This will shut down power in buildings 5000, 2900, 2500, 2100, 2200, 3000, 2400, 2300, 1800, 2700, and 2600.
  • Areas Affected: Power shutdown in buildings 5000, 2900, 2500, 2100, 2200, 3000, 2400, 2300, 1800, 2700, and 2600
  • Duration: 6 am-6 pm on July 10.

Saturday, July 17 – Power Feeder Shutdown for Bldg. 2100:

  • Description: Shutdown Feeders C and D in 9000. This will shut down power in buildings 5000, 2900, 2500, 2100, 2200, 3000, 2400, 2300, 1800, 2700, and 2600.
  • Areas Affected: Power shutdown in buildings 5000, 2900, 2500, 2100, 2200, 3000, 2400, 2300, 1800, 2700, and 2600.
  • Duration: 6 am-6 pm on July 17.

If you have any questions about these changes, please contact Pete Babbington, Acting Director of Facilities (pbabbington@shoreline.edu).